800 637-7968

Call us for assistance!

sales@ipibybison.com

Email us today!

Park Middle School and the Boys & Girls Club

Park Middle School and the Boys & Girls Club

The new equipment will help Park Middle School and the Boys & Girls Club continue to foster the mission of keeping kids active. Park Middle School shares facilities with the Boys & Girls Club to provide a wide range of services before and after school for students.

The equipment included in the project:

  • PI1360FF Forward Folding, Front Braced Backstop
  • BA42XL 42″ x 72” Rectangular Glass Backboard
  • BA35S ProTech Breakaway Goal for 42” Backboards
  • BA68U-GR DuraSkin Padding for Rectangular Shaped Backboard
  • BA980RS ZipCrank 10’ to 8’ Goal Height Adjuster
  • BA975 Key Operated Basketball Backstop Hoist
  • BA955 Saf-Lok Basketball Safety Catch
  • IP10WB Wall Mounted Stationary Backstop- 2′ Extension
  • BA495 Fan Shaped Dura Steel Backboard
  • BA35 ProTech Competition Breakaway Goal
  • BA68F DuraSkin Padding for Fan Shaped Backboard
  • WP62 24″ x 72” x 2” Wall Pad with Hidden Mount Track
  • VB27 4” Floating Floor Socket and Hinged Brass Floor Plate

More Projects

Canada Centre

Canada Centre

The largest international and IPI by Bison equipment order is currently being installed at the Canada Centre, located in Regina, Saskatoon, Canada. This facility will showcase six ceiling basketball systems, two T-Rex Competition portables, three divider walk draw...

Sachem High School East

Sachem High School East

IPI by Bison dealer, Gym Equipment Repairs of Hollis, NY, recently completed a project at Sachem High School East in Farmingville, NY, to replace their aging divider curtain.  The existing curtain was in such...

Toll-free Phone

Toll-free Fax

(800) 638-0698

Local Fax

(402) 474-6720

}

Monday-Friday 8-5 CST